Description: Design and construction of a 17 m³ per day reed bed for a Marine Research Center
Location: Khor Fakkan, Sharjah, UAE
Year: 2024
End Client: Sharjah University
Description: Design and construction of a 100 persons equivalent per day reed bed for a Permaculture Garden
Location: Education City, Doha, Qatar
Year: 2025
End Client: Qatar Foundation
Description: Design of a 16,000 m³ per day reed bed for sewage treatment
Location: Umluj, Tabuk Region, KSA
Year: 2022
End Client: Red Sea Global & ACWA Power
Description: Design & Build of a 180 m³ Natural Swimming Pool with Planted Garden Filter & UV Disinfection
Location: Dubai, UAE
Year: 2023
End Client: Private
Description: Design & Build of 9 automated constructed wetland mesocosms for the purpose of scientific research
Location: Ras Al Khaima, UAE
Year: 2022
End Client: American University - Research and Innovation Center
Description: Design and Build of a 20 m³ per day sewage treatment plant using reed bed technology with waste water originated from restaurant
Location: Al Dhaid, Sharjah, UAE
Year: 2021
End Client: H.H. Ruler’s Office
Description:Design and Build a 490 m³ lake used as recreation area for elephants where water is treated and recycled by reed bed
Location: Al Dhaid, Sharjah, UAE
Year: 2021
End Client: H.H. Ruler’s Office
Description: Design and Build a 1500 m³ lake used as recreation area for elephants where water is treated and recycled by reed bed
Location: Al Dhaid, Sharjah, UAE
Year: 2021
End Client: H.H. Ruler’s Office
Description: Design and Build a 465 m³ lake used as recreation area for elephants where water is treated and recycled by reed bed
Location: Al Dhaid, Sharjah, UAE
Year: 2021
End Client: H.H. Ruler’s Office
Description: Design and Build of a 20 m³ per day sewage treatment plant using reed bed technology with waste water originated from animal keepers camp
Location: Al Dhaid, Sharjah, UAE
Year: 2021
End Client: H.H. Ruler’s Office
Description: Design and Build of a 44 m³ per day sewage treatment plant using reed bed technology with waste water originated from cafetarias
Location: Al Dhaid, Sharjah, UAE
Year: 2021
End Client: H.H. Ruler’s Office
Description: Design and Build of a 27m³ per day sewage treatment plant using reed bed technology with waste water originated from animal cages
Location: Al Dhaid, Sharjah, UAE
Year: 2021
End Client: H.H. Ruler’s Office
Description: Design and Build of a 140 person equivalent per day sewage treatment plant using reed bed technology with waste water originated from reception area and visitors toilets
Location: Al Dhaid, Sharjah, UAE
Year: 2021
End Client: H.H. Ruler’s Office
Description: Design and Build of a 700m² treated sewage effluent lake located at the restaurant using reed bed filtration
Location: Al Dhaid, Sharjah, UAE
Year: 2021
End Client: H.H. Ruler’s Office
Description: Design Build and Operate (DBO) of a smart water reuse system composed of different streams of treatment : grey water, black water, brackish water and condensate water, where all treated water is reused locally. The reed bed is treating sewage of 10,000 users per day while being solar operated, this very unique STP designed within a public area which can be experienced by the visitors through wooden walkways directly built on top of the reed bed
Location:Dubai, UAE
Year: 2020
End Client:DUBAI EXPO / EMAAR
Description: Design Build of a Constructed Wetland of 3,750 m³ per day as part of an Environment Impact Assessment EIA wild life habitat compensation
Location: Dubai, UAE
Year: 2018 & 2019
End Client: EMAAR
Description: Design Build of a Constructed Wetland of 50 m³ per day Pilot Reed Bed for sewage recycling.
Location: Muscat, Oman
Year: 2017
End Client: HAYA WATER
Sewage Treatment Plant Capacity: About 1000 visitors per day
Location: Kalba, Sharjah, UAE
Year: 2016
End Client: HH Ruler's Office
Sewage Treatment Plant Capacity: 900 m³ per day
Location: Al Haray, Sharjah, UAE
Year: 2015
End Client: UAE Ministry of Infrastructure
Sewage Treatment Plant Capacity: 200 m³ per day
Location: AI Hamra, Ras AI Khaimah, UAE
Year: 2014
End Client: UAE Ministry of Infrastructure
Description: Design and Build of a 18,000 m³ TSE treated sewage efflent lake
Location: Umm Salal Ali, Doha, Qatar
Year: 2012
End Client: Ministry of Infrastructure
Sewage Treatment Plant Capacity: Recycling waste water from 300 guests per day, located on two areas covering both lodge and main hotel building
Location: Sir Bani Yas Island, Abu Dhabi, UAE
Year: 2011
End Client: Tourism Development Investment Company TDIC